top of page

Building Perspectives

Front Facade
Ernesto_Fachada_Fundo_R2_Reduzida.jpg
Piso_Cave_3D.jpg
Terrace
Images are virtual and may not perfectly represent reality.

Building Floor-Plans

Floor_Under.jpg
Underground
Floor_0.jpg
Ground Floor
Floor_1.jpg
First Floor
Floor_2.jpg
Second Floor
Floor_3.jpg
Terrace

Completion of the construction work: SUMMER 2026

Architectonic Design: A43 (www.a43.pt)​

 

Construction: Fielnorte (www.fielnorte.pt)​​​

​

Construction Supervision: JAC Engenharia (www.jacengenharia.com)

 

The project is made up of two buildings, the building to the north called Azuaga 68 and the building to the south called Ernesto 65, with construction works starting in July 2024.

 

​The Ernesto 65 building is made up of 6 units, 2 T0, 2 T1 and 2 T2.

 

​The building will be built with a medium to high-end standard finishing.

 

The apartments will have: kitchen with Margrés ceramic flooring or similar, bench top in Silestone compact quartz, living rooms and bedrooms with oak flooring and walls covered in painted plasterboard; bathroom covered with Margrés ceramics or similar. The sanitary appliances will all be a high-end model.

 

All apartments will be delivered with all appliances, Siemens, and Midea air conditioning. Heat pump water heating system. Energy certification will be level A.

 

​​Both buildings have an elevator and the access ramp to the garage will be via Rua Ernesto Silva.

​

You can download the finishing table here.

bottom of page